FieldEast Webb
Data flowing · 2 of 14 wells late or silent
Sample data · mock-up 7
OP

EW5567

Events & notes · Pad B · East Webb
ESP Warning

Events and notes · EW5567

Setpoints, trips, tests, shift notes
03:30NoteProduction engineer: Well test sent to the VFM. Discharge pressure sensor to be checked at the next visit.
03:30WellTestTest complete: 1,236 bbl/d liquid, 71% water cut. Sent to the VFM for comparison.

Alarms · EW5567

All alarms
Warning44 min ago · UnacknowledgedIntake pressure low388 psi (limit 400 psi)Warning1 h ago · UnacknowledgedVFM output differs from last well test+9.1 % (limit ±8 %)
An unhandled error has occurred. Reload 🗙

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.