FieldEast Webb
Data flowing · 2 of 14 wells late or silent
Sample data · mock-up 7
OP

EW2260

Overview · Pad B · East Webb
ESP Critical
Live · updated 08:08:39
Oil rate (VFM)
308bbl/d
79% water cut
Liquid rate (VFM)
1,461bbl/d
Gas 405 Mcf/d
Frequency
53.8Hz
Setpoint 53.8 Hz
Motor current
41.4A
Alarm 45 A
Intake pressure
412psi
Minimum 350 psi
Motor temperature
247°F
Alarm 245 °F

Health

Critical
Failure window
9–16 days
Open health

Active alarms

Events
Critical11 min agoMotor winding temperature high248 °F (limit 245 °F)Warning30 min agoVibration above baseline0.62 g (limit 0.50 g)

Optimization

Open
Frequency
53.8 Hz → 51.0 Hz
Predicted change -31 bbl/d · nothing is applied until approved.

PlexPilot insight

Assistant
Winding temperature has climbed for 10 days while flow stays inside the recommended range, which points to the motor rather than the process. Reducing to 51 Hz keeps it under the limit and buys time for a planned workover.

Live operation

Pump performance · live operating point

Head, power and efficiency vs. flow at 53.8 Hz
ESP string
Surface VSD53.8 Hz
Discharge pressure1,925 psi
Pump · 280 stages3,518 ft
Intake pressure412 psi
Seal · protectorNormal
Motor temperature247 °F
Position in rangeInside range

Production

Current oil
308bbl/d
VFM estimate
Potential oil
422bbl/d
Model estimate
Realization
73%
Current ÷ potential
Production gap
110bbl/d
3,300 bbl over 30 days

Actual vs potential · 7 days

● Actual ● Potential

Where the gap comes from

110 bbl/d
Not at optimal frequency
22
Gas interference
38
Low intake pressure
33
Downtime and trips
16
Losses are estimated by the optimization and diagnostics models.
An unhandled error has occurred. Reload 🗙

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.