EW5120
Overview · Pad B · East Webb
Gas lift
Normal
Live · updated 08:37:47
Oil rate (VFM)
237bbl/d
69% water cut
Liquid rate (VFM)
758bbl/d
Gas 522 Mcf/d
Gas injection
0.81MMscf/d
Target 0.80
Casing pressure
1,021psi
Limit 1,100 psi
Tubing pressure
313psi
Limit 400 psi
Gas-oil ratio
2,204scf/bbl
Produced gas / oil
Health
NormalActive alarms
EventsNo active alarms on this well.
Optimization
OpenGas injection rate
0.81 MMscf/d → 0.92 MMscf/d
Predicted change +14 bbl/d · nothing is applied until approved.
PlexPilot insight
AssistantNo anomalies on EW5120. All signals are inside their normal bands and the health score is 87.
Live operation
Gas lift performance · liquid rate vs. injection
Current point and modelled optimumTrends
Dashed line is the alarm or operating limitGas injection0.00 MMscf/d
Target 0.80
Casing pressure0 psi
Limit 1,100 psi
Tubing pressure0 psi
Limit 400 psi
Liquid rate0 bbl/d
Low-rate alert
Production
Current oil
237bbl/d
VFM estimate
Potential oil
265bbl/d
Model estimate
Realization
89%
Current ÷ potential
Production gap
27bbl/d
810 bbl over 30 days
Actual vs potential · 7 days
● Actual ● PotentialWhere the gap comes from
27 bbl/dInjection below target16
Valve or orifice issue5
Header pressure3
Downtime and trips3
Losses are estimated by the optimization and diagnostics models.