EW6034
Overview · Pad D · East Webb
Gas lift
Normal
Live · updated 08:37:25
Oil rate (VFM)
264bbl/d
68% water cut
Liquid rate (VFM)
818bbl/d
Gas 559 Mcf/d
Gas injection
0.86MMscf/d
Target 0.85
Casing pressure
1,052psi
Limit 1,100 psi
Tubing pressure
300psi
Limit 400 psi
Gas-oil ratio
2,114scf/bbl
Produced gas / oil
Health
NormalActive alarms
EventsNo active alarms on this well.
Optimization
OpenGas injection rate
0.86 MMscf/d → 0.97 MMscf/d
Predicted change +15 bbl/d · nothing is applied until approved.
PlexPilot insight
AssistantNo anomalies on EW6034. All signals are inside their normal bands and the health score is 89.
Live operation
Gas lift performance · liquid rate vs. injection
Current point and modelled optimumTrends
Dashed line is the alarm or operating limitGas injection0.00 MMscf/d
Target 0.85
Casing pressure0 psi
Limit 1,100 psi
Tubing pressure0 psi
Limit 400 psi
Liquid rate0 bbl/d
Low-rate alert
Production
Current oil
264bbl/d
VFM estimate
Potential oil
293bbl/d
Model estimate
Realization
90%
Current ÷ potential
Production gap
28bbl/d
840 bbl over 30 days
Actual vs potential · 7 days
● Actual ● PotentialWhere the gap comes from
28 bbl/dInjection below target17
Valve or orifice issue6
Header pressure3
Downtime and trips3
Losses are estimated by the optimization and diagnostics models.