FieldEast Webb
Data flowing · 2 of 14 wells late or silent
Sample data · mock-up 7
OP

EW5871

Overview · Pad C · East Webb
Gas lift Warning
Live · updated 08:36:43
Oil rate (VFM)
190bbl/d
73% water cut
Liquid rate (VFM)
692bbl/d
Gas 482 Mcf/d
Gas injection
0.62MMscf/d
Target 0.80
Casing pressure
879psi
Limit 1,100 psi
Tubing pressure
355psi
Limit 400 psi
Gas-oil ratio
2,533scf/bbl
Produced gas / oil

Health

Warning
Failure window
50–80 days
Open health

Active alarms

Events
Warning1 h agoInjection rate below target0.62 MMscf/d (limit 0.80 MMscf/d)

Optimization

Open
Gas injection rate
0.62 MMscf/d → 0.75 MMscf/d
Predicted change +12 bbl/d · nothing is applied until approved.

PlexPilot insight

Assistant
Injection is below target and tubing pressure is unstable. A partly plugged choke or a leaking valve are the likely causes.

Live operation

Gas lift performance · liquid rate vs. injection

Current point and modelled optimum

Production

Current oil
190bbl/d
VFM estimate
Potential oil
247bbl/d
Model estimate
Realization
77%
Current ÷ potential
Production gap
57bbl/d
1,710 bbl over 30 days

Actual vs potential · 7 days

● Actual ● Potential

Where the gap comes from

57 bbl/d
Injection below target
20
Valve or orifice issue
14
Header pressure
14
Downtime and trips
9
Losses are estimated by the optimization and diagnostics models.
An unhandled error has occurred. Reload 🗙

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.