FieldEast Webb
Data flowing · 2 of 14 wells late or silent
Sample data · mock-up 7
OP

EW5871

Health · Pad C · East Webb
Gas lift Warning

Fleet health

Highest risk first

EW5871 · health and forecast

Degrading
Health score
50–80 days
Predicted failure window

Failure-mode risk

Gas lift valve leak49%
Orifice plugging37%
Compressor trip14%

What the model sees

▸Injection rate 0.62 against a 0.80 MMscf/d target
▸Casing pressure drifting low
▸Tubing pressure unstable (heading)

Recommended action

Inspect gas lift valve 3 on the next wireline job and verify the injection choke setting.
An unhandled error has occurred. Reload 🗙

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.