EW5871
Health · Pad C · East Webb
Gas lift
Warning
Fleet health
Highest risk firstWell | Health score | Failure window | Confidence |
|---|---|---|---|
| EW2260 | 38 | 9–16 days | 82% |
| EW6650 | 57 | 35–60 days | 69% |
| EW5871 | 61 | 50–80 days | 66% |
| EW5567 | 64 | 28–45 days | 74% |
| EW9012 | 71 | Not estimated (shut-in) | 60% |
| EW4410 | 82 | > 120 days | 85% |
| EW3391 | 84 | > 120 days | 85% |
| EW1123 | 86 | > 120 days | 85% |
| EW5120 | 87 | > 120 days | 85% |
| EW4432 | 88 | > 120 days | 85% |
| EW6034 | 89 | > 120 days | 85% |
| EW2278 | 90 | > 120 days | 85% |
| EW3345 | 91 | > 120 days | 85% |
| EW7788 | 93 | > 120 days | 85% |
EW5871 · health and forecast
DegradingHealth score
50–80 days
Predicted failure window
Failure-mode risk
Gas lift valve leak49%
Orifice plugging37%
Compressor trip14%
What the model sees
▸Injection rate 0.62 against a 0.80 MMscf/d target
▸Casing pressure drifting low
▸Tubing pressure unstable (heading)
Recommended action
Inspect gas lift valve 3 on the next wireline job and verify the injection choke setting.