FieldEast Webb
Data flowing · 2 of 14 wells late or silent
Sample data · mock-up 7
OP

EW5871

Optimization · Pad C · East Webb
Gas lift Warning
Objective: maximize oil rate within equipment and process constraints

Recommended setpoint · Gas injection rate

Recommended 0.75 MMscf/d
Current
0.62 MMscf/d
→
Selected
0.75 MMscf/d
Predicted oil
202 bbl/d
Change
+12 bbl/d

Scenarios

Compare options before you decide

Constraint check at selected setpoint

Calculated by the lift model
ConstraintNowPredictedLimitResult
Casing pressure880 psi932 psi≤ 1,100 psiWithin limit
Tubing pressure354 psi369 psi≤ 400 psiWithin limit
Lift-gas headroom0.35 MMscf/d0.22 MMscf/d≥ 0.00 MMscf/dWithin limit
An operator approves the change before it reaches the controller.
An unhandled error has occurred. Reload 🗙

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.