FieldEast Webb
Data flowing · 2 of 14 wells late or silent
Sample data · mock-up 7
OP

EW9012

Health · Pad D · East Webb
ESP Shut-in

Fleet health

Highest risk first

EW9012 · health and forecast

Degrading
Health score
Not estimated (shut-in)
Predicted failure window

Failure-mode risk

Motor insulation breakdown28%
Pump wear24%
Gas interference40%

What the model sees

▸Underload trip at 12:41
▸Intake pressure recovering after shut-in

Recommended action

Review the trip cause and run the restart checklist before returning the well to production.
An unhandled error has occurred. Reload 🗙

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.