EW2278
Optimization · Pad E · East Webb
Rod pump
Normal
Delayed
Data from EW2278 is 6606 s old (expected every 5 s). Source: Delayed · weak radio signal at Pad E
Open diagnostics
Recommended setpoint · Strokes per minute
Recommended 6.1 SPMCurrent
5.5 SPM
→
Selected
6.1 SPM
Predicted oil
60 bbl/d
Change
+2 bbl/d
Scenarios
Compare options before you decideConstraint check at selected setpoint
Calculated by the lift modelConstraintNowPredictedLimitResult
Peak rod load16.7 klbs17.3 klbs≤ 24.0 klbsWithin limit
Pump fillage85 %80 %≥ 55 %Within limit
Motor current19.9 A22.2 A≤ 30.0 AWithin limit